Thames Flood Alleviation - Desborough Channel safe

11 Oct 2019

 On Wednesday 2nd October, Weybridge Riverside ward councillors met with representatives from the Environment Agency and their consultants in the team tasked with River Thames Flood Alleviation Scheme.

This work has been ongoing for several years now, with serious hydraulic modelling of flows in the Thames around Weybridge. The outcome of the most recent work are positive for Weybridge residents. It appears the flood risk for Weybridge can be reduced without any modification to the banks of the Desborough Channel - the stretch of water that separates Desborough Island from the eastern bank of the Thames alongside Walton Lane.

There is now no threat to the towpath and no need to cut back the bank on Desborough Island, with the consequent loss of trees.  Instead, it is proposed the river bed will be lowered further downstream.

This website uses cookies

Please select the types of cookies you want to allow.

These are necessary for the website to function properly.
These help us to understand how our visitors use our website.
These allow us to display content from other websites that track you for advertising purposes.